This was a major Renovation done in 2017:
There are some ‘before’ photos, ‘during’ and ‘after’ so you can see the progress and transformation. The job involved removing the floor slab, replacing all plumbing. The hot & cold copper pipework in floor had corroded & burst. A WC was added to the bathroom, a new concrete floor slab, tiling to 2 metres high, fixtures were moved around, 10mm fixed shower panel added plus walk in shower (wet room )…