Full bathroom renovation, removal of fixtures & tiles. Removal of concrete floor slab to replace old steel waste plumbing for new plastic wastes & to also lower floor at doorway to avoid step & to allow for a walk in shower recess. Tiling floor to ceiling, installation of 10mm toughened glass shower panel measuring 2m high x 1.2m

