Entering from the garage the bathroom & laundry are connected via an area which accommodates the vanity unit. Straight forward make over with fixtures not being moved. 


Main bathroom renovation in a rented town house.
Finished rooms after budget renovation, fixtures stay in same location.
After 5 weeks of work the renovation is complete, 2 new bathrooms & separate wc with floor to ceiling tiling. Floor tiling using a 450×450 Spanish tile running through most of the house. New kitchen installed with breakfast bar & tiling above bench top. Painted throughout using white on the ceilings, antique white to walls & the same to all woodwork. New carpets to bedrooms & front lounge.
The property went on the market & sold within 4 weeks for the full asking price.













This was a first floor ensuite full renovation, with timber stud walls covered by gyprock. We removed everything getting back to studs & concrete as the photos show.