Wet room bathroom designed for wheelchair bound client.
Built to health department guidelines, part paid by government grant.
Electric heated floor, bespoke cabinets with stone top, floor to ceiling tiling. 



Wet room bathroom designed for wheelchair bound client.
Built to health department guidelines, part paid by government grant.
Electric heated floor, bespoke cabinets with stone top, floor to ceiling tiling. 



Ensuite renovation in Greenwood: another major renovation, with new plumbing & electrical, replaced ceiling and windows. All walls required rendering, bespoke cabinets, recess shelf in shower, shower screen panels & mirror not installed yet, free standing bath not installed yet, tiling to ceiling … see the progress and after photos:
What a transformation!
Laundry renovation in Bull Creek (2017) – same house as the bathroom renovation: job included bespoke cabinets and tiling…
Bathroom renovation in Bull Creek (2017): the job included removing a bath, adding a walk in shower, tiling to ceiling, with a 10mm shower panel; before & after photo …
Ensuite renovation in City Beach (2017): the job included tiling to 2 metres, bespoke cabinets, WC location altered, recess shelf in shower … a ‘before’ and ‘after’ photos are shown:
Ensuite renovation in North Perth (2017): this was another major renovation, with heated floor installation, designer floor tiles, bespoke cabinets, walk in shower. ‘During’ and ‘after’ photos show the progression and completion of the work…
Bathroom renovation in Scarborough: the same house as the ensuite renovation, for this bathroom I added a walk in shower and a nib wall with 10 mm shower panel on top…
Bathroom renovation in Lathlain – before and after photos: this was a major Renovation completed in 2017: with a new window, replacement of all plumbing, bath removal, adding an extra WC, laying a new concrete floor slab, tiling to 2 metres, plus a walk in wet shower area…